WEPCo Limited and Bridgend County Borough Council Education Department are collaborating on the redevelopment of Ysgol Y Ferch O’r Sger and the amalgamation of Corneli Primary School and Afon-Y-Felin Primary School in a new building (Bridgend West Primary Cluster). The project entails the construction of an English Medium Primary School and a Welsh Medium Primary School within the Bridgend West (Cornelly area).

Project Highlights

  • Modern Learning Spaces: The two new primary schools will feature spacious, modern classrooms equipped with the latest technology designed, providing 21st-century learning environments. These environments are designed to inspire creativity and engagement among learners.
  • Dedicated Outdoor Areas: We understand the importance of outdoor play and learning. The project will include expansive playgrounds, green spaces, and sports facilities, all designed to encourage physical activity and exploration.
  • Community Integration: Our schools are not just places for education; they are designed to be integral parts of the community.
  • Sustainable Design: In line with our commitment to sustainability, the schools will operate as Net-Zero Cabon facilities, constructed using sustainable materials and incorporating energy-efficient technologies.

Location

  • Welsh Medium School Primary School (Corneli Site) – replacement of the existing Ysgol Y Ferch O’r Sgêr – located at existing Corneli Primary School site (Land at West of Heol Y Parc, North Cornelly, CF33 4LW) – Ysgol Y Ferch O’r Sgêr is a Welsh Medium school providing education for children between 3 and 11 years of age.
  • English Medium School Primary School (Marlas Site) – (amalgamation of existing Corneli Primary School and Afon-Y-Felin Primary School)- located at Marlas Site (Land at East of Heol Y Parc, North Cornelly, CF33 4LW). The proposed new building – Marlas Site, is an English Medium school providing education for children between 3 and 11 years of age.

Capacity
The school will have the capacity to accommodate two classes per year group, ensuring a comprehensive and high-quality educational experience:

  • Welsh Medium Primary School (Corneli Site)
    The proposed building will accommodate 420 pupils aged 4-11 and a nursery to accommodate 60 pupils.
  • English Medium Primary School (Marlas Site)
    The proposed building will accommodate 420 pupils aged 4-11 and a nursery to accommodate 60 pupils plus 15 ALN Students.

Community Benefits
The construction of the Bridgend West Primary Cluster will bring several advantages to the local community:

  • Increased Educational Opportunities: With the re-development of the existing schools, parents and guardians will have greater access to high-quality primary education for their children.
  • Local Employment Opportunities: The construction phase of this project will provide job opportunities for local residents, contributing to the region’s economic growth.
  • Strengthened Community Bonds: By creating spaces for community events and activities, we hope to strengthen the sense of unity and collaboration among local residents.

Project Development Update

WEPCo Limited and Bridgend County Borough Council (as joint Applicant) are intending to apply for planning permission to Bridgend County Borough Council (BCBC) for the Bridgend West Primary Cluster development for the following:

Proposed redevelopment of Cornelly Primary School and Ysgol Y Ferch O’r Sger, including the demolition of all existing buildings, the erection of a new Net Zero Carbon in operation school building, school sports provision, vehicular, pedestrian and cycle accesses, car and cycle parking, landscaping Sustainable Urban Drainage and associated infrastructure.

Formal pre-application consultation (PAC) on the draft Bridgend West Cluster planning application commenced on the 13th October 2023 and will end on the 10th November 2023.

Copies of the draft planning application documents including the proposed application, the plans and supporting documents are available to view online here

English Medium Primary School (Marlas Site): https://theurbanists.net/application/proposed-new-english-medium-primary-school-in-marlas-bridgend/

Welsh Medium Primary School (Corneli Site): https://theurbanists.net/application/proposed-new-welsh-medium-primary-school-in-corneli-bridgend/

During this period you are provided with the opportunity to comment directly on the draft application prior to its submission to BCBC as the local planning authority (LPA).

The subsequent planning application will be publicised by the relevant LPA and any comments provided in response to the draft application will not prejudice your ability to make representations to the LPA on the related planning application. You should note that any comments submitted may be placed on the public file.

The construction of the Bridgend West Primary Cluster is an exciting endeavour that will positively impact our community’s education landscape. We look forward to making this vision a reality and creating a nurturing and inspiring space for generations of learners to come.